This Capcom Service Bulletin applies to:
Pinball Magic Pinball

Back to all Capcom Pinball Service Bulletins

COIN-OP, INC.
(Pinball Division is out of business)

TECHNICAL SERVICE INFORMATION

NOVEMBER 1, 1995

SUBJECT:  RETRO FIT KIT FOR  MAGIC(tm).  SLING SHOTS, AND FLIPPERS.

BILL OF MATERIAL  KIT#  K-009

QTY 1               INSTRUCTION  SHEETS                                    PM00135

QTY 2               2 3/4” RUBBER                                                 PN RB00108-11

QTY 6               #8 SCREW MINI POST                                      PN SM00151

QTY 3               MYLAR TEMPLATES

QTY 1               PLUNGER/LINK/CLAMP/ACTUATOR                  A-00549-L                    

QTY 1               PLUNGER/LINK/CLAMP/ACTUATOR                  A-00549-R

“A”

* POSITION #1.

1.         REMOVE FRONT SCREW, POST & WASHERS OFF THE FRONT OF  PLASTIC RAMP OVER     THE LOWER LEFT SLINGSHOT.

2.         REMOVE THE 2 NUTS OFF OF THE  SLINGSHOT PLASTIC PN AW00123-9.

3.         REMOVE 3” RUBBER  RING AND DISCARD.

4.         SLIDE THE LOWER LEFT SLINGSHOT TEMPLATE IN POSITION, ALIGNING THE EDGE OF         THE THREE HOLES IN THE PLAYFIELD WITH THE BLACK LINE OF THE TEMPLATE.

5.         USING A CENTER PUNCH MARK THE PLAYFIELD OVER THE 2 X’s.

6.         DRILL THE TWO HOLES WITH A 2mm 1/16” DRILL.

7.         INSTALL NEW POST PN SM00151 IN THE TWO HOLES NEAR THE SWITCH HOLES.

8.         INSTALL NEW 2 3/4” RUBBER PN RB00108-11.

9.         REINSTALL PLASTIC.

10.        REINSTALL PLASTIC RAMP.

* POSITION #2

1.         REMOVE LOWER NUT AND TWO WASHERS OFF OF THE  WIRE RAMP.

2.         REMOVE THE TWO NUTS OFF OF THE PLASTIC.

3.         REMOVE SLINGSHOT PLASTIC  PN AW00123-8.

4.         REMOVE 3” RUBBER RING AND DISCARD.

5.         SLIDE THE LOWER RIGHT SLINGSHOT TEMPLATE IN POSITION, ALIGNING THE EDGE            OF THE THREE HOLES IN THE PLAYFIELD WITH THE BLACK LINE OF THE TEMPLATE.

6.         DRILL THE TWO HOLES WITH A 2mm  1/16” DRILL.

7.         USING A CENTER PUNCH MARK THE PLAYFIELD OVER THE 2 X’s.

8.         INSTALL NEW POST  PN SM00151 IN THE TWO HOLES NEAR THE SWITCH HOLES.

9.         INSTALL NEW  2 3/4” RUBBER PN RB00108-11.

10.        REINSTALL PLASTIC.

11.        REINSTALL WIRE RAMP TWO WASHERS AND NUT.

*POSITION  #3

1.         REMOVE  THE 3 NUTS AND ONE SCREW OFF OF  PLASTIC OVER STAR BUMPER UPPER     PN AW0123-12,  AND LOWER PN AW0123-22..

2.         REMOVE PLASTIC OVER SLINGSHOT ASSEMBLY.

3.         SLIDE THE UPPER SLINGSHOT TEMPLATE IN POSITION, ALIGNING THE EDGE OF THE           THREE HOLES IN THE PLAYFIELD WITH THE BLACK LINE OF THE TEMPLATE.

4.         USING A CENTER PUNCH MARK THE PLAYFIELD OVER THE 2 X’s

6.         DRILL THE TWO HOLES WITH A 2mm 1/16”  DRILL.

7.         INSTALL NEW POST PN SN00151 IN THE TWO HOLES NEAR THE SWITCH HOLES.

8.         REINSTALL PLASTIC.

                       

FLIPPER UPGRADE

1.         REMOVE THE TWO SCREWS THAT HOLD THE BRACKET, COIL RETAINER FROM EACH          FLIPPER ASSEMBLY.

2.         LOOSEN THE CLAMP HOLDING SCREW.

3.         DISCONNECT THE ACTUATOR SPRING.

4.         FROM THE TOP OF THE PLAYFIELD, SLIDE THE FLIPPER BAT UP.

5.         SLIDE THE OLD BLUE PLUNGER/LINK/CLAMP/ACTUATOR ASSEMBLY OUT OF THE    GAME.

6.         INSTALL THE NEW PLUNGER/LINK/CLAMP/ACTUATOR ASSEMBLY [WITH GRAY LINK]

            THROUGH THE COIL RETAINER AND INTO THE COIL AND SLEEVE.     

7.         REINSTALL THE TWO SCREWS THAT HOLD THE BRACKET, COIL RETAINER.

8.         REINSTALL THE FLIPPER PADDLE.  ALIGN AND TIGHTEN THE CLAMP SCREW.

9.         RECONNECT THE ACTUATOR SPRING.

10.        RECHECK THE END OF STROKE SWITCH ADJUSTMENT.